New look,
same JCB MED

Hospital infrastructure, built to last.

The services a hospital cannot run without: medical gas systems, anaesthetic gas scavenging (AGSS), sterilisation rooms, bedhead units and the building works around them — designed, installed and commissioned by one team.

Kira Hospital (Swiss Clinic)
PRJ-01Kira Hospital (Swiss Clinic)

What we build

Everything behind the walls

INF-01

Medical gas systems

Oxygen, medical air, vacuum, nitrous oxide and CO₂ — from cylinder manifolds to on-site production plants and pipelines to every bed.

INF-02

Anaesthetic gas scavenging (AGSS)

Active scavenging systems that remove waste anaesthetic gases from theatres and protect clinical staff.

INF-03

Sterilisation rooms

Sterile services departments planned around a clean workflow, with autoclaves, washer-disinfectors and packaging.

INF-04

Bedhead units & ward services

Bespoke, rust-resistant bedhead trunking carrying gases, power, lighting and nurse call.

INF-05

Operating theatre fit-out

Theatres delivered complete: gases, pendants, lights, tables, anaesthesia and monitoring.

INF-06

Building & renovation

New wards, maternity units, pharmacies and laboratories, or upgrades to existing buildings.

Planning a new unit or an upgrade?

Tell us what your facility needs and we'll come back with a costed proposal and a timeline.

Request a quote